Article
Publication date: 1 February 2022

Chijoo Lee

Work crew productivity and the application of limited resources are necessary elements in construction duration delay analysis. This study thus proposes a method to analyze…

Abstract

Purpose

Work crew productivity and the application of limited resources are necessary elements in construction duration delay analysis. This study thus proposes a method to analyze construction delays and resource reallocation based on work crew productivity and resource constraints. The study also presents an economic feasibility analysis that maximizes economic effect by reducing construction duration, the cost of resource reallocation, delay liquidated damages (DLDs) and incentives for reducing contractual duration.

Design/methodology/approach

The proposed method involved three steps. First, work crew characteristics such as productivity, unit price and workload helped analyze delay information, including delay duration, reducible duration and daily reduced cost. Next, a goal programming method assessed resource reallocation based on the priority (as determined by decision-makers) of each constraint condition, such as the available number of workers, cost, goal workload and statutory working hours. Lastly, the level of reallocation was analyzed based on the results of the economic feasibility analysis and decision-makers’ delay attitudes.

Findings

A case study was performed to test the proposed method's applicability. Its involved sensitivity analysis indicated proposing to decision-makers a scenario based on the prioritization of economic feasibility. The proposed method's applicability proved high for decision-makers, as they can determine whether to reduce construction duration per the proposed data.

Originality/value

The proposed method's main contribution is the reallocation of resources to reduce construction duration based on work crew productivity and the prioritization of limited resources. The proposed method can analyze the differences in productivity between the plan and actual progress, as well as calculate the necessary number of workers. Decision-makers can then reduce the appropriate level of contractual duration based on their own delay attitude, constraint condition prioritization and results from daily economic feasibility analyses.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 June 2019

Chijoo Lee

Special purpose companies issue stocks to raise money to finance development of real estate and infrastructure. The advantage of a stock issue is that it does not entail financial…

Abstract

Purpose

Special purpose companies issue stocks to raise money to finance development of real estate and infrastructure. The advantage of a stock issue is that it does not entail financial cost such as interest on a loan. However, financing obtained in this way has been insufficient due to low interest by investors because of the large variability of the stocks’ earnings rates. The purpose of this paper is to propose methods to improve investment earnings rate for financing.

Design/methodology/approach

The proposed methods are Markowitz’s model and a combination of Markowitz’s model and Monte Carlo simulation. The proposed methods were verified by comparison with actual earnings rate.

Findings

The earnings rate was increased by as much as 23 percent over the actual value. Then, earnings rate compared with risk was analyzed using the Sharpe ratio which is a method to measure investment performance. The performance was also increased by as much as 23 percent over the actual value. The proposed method can help activate investment by increasing investors’ interest in the stock issue.

Originality/value

This study verified that Markowitz’s portfolio model, which is used for econometrics, could be applied for financing of construction project. It is valuable because the previous studies did not propose the method for financing.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Content available
Book part
Publication date: 10 November 2021

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9